- Web based Module (Pipeline software)
- Progress reporting through graphics (breakup & Consolidated at chainage intervals/stations).
- Inventory Management (Receipt,inspection,consumption,utilization).
- Detailed Joint level & Section level monitoring/review reports.
- Overall progress reports based on %weightage against activities.
- Welder & WPS qualification & management.
- Repair management.
- Pipe Book management.
- Optional Customization using Barcodes & Scanning Technology.
Pipeline – Major Activities :
- Surveying & Staking
- Clearing
- Grading
- Topsoil Segregation
- Trenching
- Stringing
- Pipe Bending
- Welding
- Non Destructive Testing (NDT)
- Field Coating
- Lowering Pipe into the Trench
- Back-filling
- Hydro-static Testing
- Restoration
Excavating the Trench :
Pipeline Construction– Critical Stages :
- Construction Staging Areas & Storage Yards
- Clear Cutting the ROW (right of way)
- Excavating the Trench
- Pipe Transport, Stringing, & Assembly
- Testing (Hydro-test,pigging,drying,nitrogen purging)
- Restoration
- Additional Infrastructure (Valve Stations/Control stations,Metering,Markers etc.)
Pipe Transport,Stringing,& Assembly :
Inventory Management :
- Material Receipt
- Material Inspection
- Material Issuance
- Pipe Book Details with Material Traceability,Utilization and testing ,Coating Details
- Managing Consumables
- Managing Plant & Machinery,Tools & Tackles
- Material Stock Register
Stringing,Joints Management & Lowering :
- Stations Master Details with From & To Chainage
- Spreads Master Details with From & To Chainage
- Unique Joints Ids association within Spreads
- Unique Joints Ids associated with Pipe Numbers
- Maintaining WPS & Welder Qualification
- Updation of Joint Progress like Bevelling & Fitup,Welding, NDT(RT/UT)
- Weld Joints repair management
- Updation of Joint level Coating progress & reports
- Section Coating Inspection/Jeeping
- Lowering of Sections
Assembling,Testing,Restoration :
- Section to section welding to connect the Pipeline
- Welding Inspection,NDT testing,Joint/Field Coating (PIH)
- Hydro-testing & Reporting
- Air Drying & Purging
- Installation of Valve Stations
- Back-filling
- Restoration
- Installation of Markers etc.
Progress Representation Grapical view :

Review Reports :
- Joint level review reports
- Pipe level review reports
- Section level review reports
- Station level review reports
- Pipe Book Detailed report
- Welder level review reports
- NDT level review reports
- Material Consumption/Utilization reports
- Overall Progress monitoring reports