• Web based Module (Pipeline software)
  • Progress reporting through graphics (breakup & Consolidated at chainage intervals/stations).
  • Inventory Management (Receipt,inspection,consumption,utilization).
  • Detailed Joint level & Section level monitoring/review reports.
  • Overall progress reports based on %weightage against activities.
  • Welder & WPS qualification & management.
  • Repair management.
  • Pipe Book management.
  • Optional Customization using Barcodes & Scanning Technology.


Pipeline – Major Activities :

  • Surveying & Staking
  • Clearing
  • Grading
  • Topsoil Segregation
  • Trenching
  • Stringing
  • Pipe Bending
  • Welding
  • Non Destructive Testing (NDT)
  • Field Coating
  • Lowering Pipe into the Trench
  • Back-filling
  • Hydro-static Testing
  • Restoration


Excavating the Trench :

                    

Pipeline Construction– Critical Stages :

  • Construction Staging Areas & Storage Yards
  • Clear Cutting the ROW (right of way)
  • Excavating the Trench
  • Pipe Transport, Stringing, & Assembly
  • Testing (Hydro-test,pigging,drying,nitrogen purging)
  • Restoration
  • Additional Infrastructure (Valve Stations/Control stations,Metering,Markers etc.)


Pipe Transport,Stringing,& Assembly :

   

Inventory Management :

  • Material Receipt
  • Material Inspection
  • Material Issuance
  • Pipe Book Details with Material Traceability,Utilization and testing ,Coating Details
  • Managing Consumables
  • Managing Plant & Machinery,Tools & Tackles
  • Material Stock Register


Stringing,Joints Management & Lowering :

  • Stations Master Details with From & To Chainage
  • Spreads Master Details with From & To Chainage
  • Unique Joints Ids association within Spreads
  • Unique Joints Ids associated with Pipe Numbers
  • Maintaining WPS & Welder Qualification
  • Updation of Joint Progress like Bevelling & Fitup,Welding, NDT(RT/UT)
  • Weld Joints repair management
  • Updation of Joint level Coating progress & reports
  • Section Coating Inspection/Jeeping
  • Lowering of Sections


Assembling,Testing,Restoration :

  • Section to section welding to connect the Pipeline
  • Welding Inspection,NDT testing,Joint/Field Coating (PIH)
  • Hydro-testing & Reporting
  • Air Drying & Purging
  • Installation of Valve Stations
  • Back-filling
  • Restoration
  • Installation of Markers etc.

Progress Representation Grapical view :


Review Reports :

  • Joint level review reports
  • Pipe level review reports
  • Section level review reports
  • Station level review reports
  • Pipe Book Detailed report
  • Welder level review reports
  • NDT level review reports
  • Material Consumption/Utilization reports
  • Overall Progress monitoring reports